MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.

Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://www.yamato-syokunin.com
Marcos inspects rock shed project in Benguet
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
- Jollibee, DepEd partner to develop quick service restaurant curriculum for senior high
- PH economic losses hit 100B from corruption in flood control projects
- Need to pee? Japan has QR code for that
- Sara Discaya admits owning 28 luxury cars
- New DPWH chief Dizon: "A department can't investigate itself"
- Escudero subpoenaes 10 DPWH contractors for Senate probe next week
- MMDA prepares for PH hosting of FIVB
- 1.2K pass Electrical Engineers exam
- Protesters storm Discaya compound for second straight day
- Roxas matriarch Judy Araneta-Roxas, 91